Large Industrial Facility
The Client
A large North American industrial facility, located on the west coast.
The Objective
- Client wanted a complete overhaul of outdated lighting systems.
- Client sought a minimum 50% reduction in lighting energy spend within a 3-month time period.
The Results
- Dazor retrofitted over 1,200 fixtures.
- Reduced annual energy consumption by 6.5 million kWh. Saved nearly $900,000 in annual lighting energy spend.
- Repair teams are able to identify defects at a faster pace due to increased visibility.
The Feedback
- "It worked so well the power company showed up twice because they thought their meter was broken."
- "That's what's attractive about you guys: you do it all."
- "We used fewer fixtures and we covered more area."